  • ESTIMATING LABOR UNIT DATA FOR CONCRETE

    MANHOURS PER SQUARE FOOT Footing form manhours are based on using 2-inch by 12-inch material pro p erly braced and anchored. If footing height is to be greater than one foot, add t we n t y- f i v e percent to manhours for each additional foot or fra c t i o n . Assume heavy mat forms to be made of 2-inch material at least 3 feet high. If

  • What are the average man hour values for concrete, form

    Labour placing membrane .033 hrs / m2 to trench mesh 0.0833 / lin m to reinforcing mesh 0.0733 hrs / m2 to reinforcing steel / 17.33 hrs / tonne labour placing concrete to strip footings 0.25 hrs / m3 placing only concrete 0.585 hrs /m3

  • Estimating Labor tpub

    When using this table, you will see that 8" x 8" x 16" block takes "one person" (skilled labor) 160 man-hours to lay 1,000 square feet of CMUs. If you were to break this labor down into how many CMUs laid in an 8-hour period, it would be calculated as follows: 1000 sf of wall area= 1,125 CMU . 160 man-hours ÷ 8 hour days = 20 duration days

  • How to Estimate Concrete Costs
    PreparationCostCompositionIf you are placing concrete over soil, you will need to grade or prepare the surface for the concrete. Pricing for this can include expenses related to grading, compacting soil, excavating, trenching, and other components. As a good average, you can use $65 per hour of work needed to prepare the surface, assuming that the surface is more than 75 percent leveled and no special work is needed to prepare the site.See more on thebalancesmb
  • Concrete Prices 2020 How Much Does Concrete Cost? The

    Concrete Forms and Finishing: $1.50 $2.00 per square foot. Labor is the biggest cost for concrete forms. Setting up concrete forms and finishing concrete is backbreaking work. More about concrete forming supplies. Reinforcement: $0.15 $0.30 per square foot. Reinforcement is required because all concrete cracks, so if you want your cracks to

  • Estimating Excavation Revised Craftsman Book Company

    cubic yards moved. That’s now the accepted procedure for most projects, from single-family homes to roads and commercial jobs. Some projects are still bid lump sum, but those are the exceptions. It’s common for the actual amount of dirt moved to be more or less than expected, so the best way to protect your business is to bid by the cubic yard.

  • File Size: 2MB
  • Rate Analysis of Excavation in Earthwork -Calculate

    Lets say for 10m3, the hydraulic excavator is taking 0.04125 day. Then its capacity considered is ((1×10)/0.04125) = 242.4242 m 3 / day. That means, a hydraulic excavator can excavate 242.4242 m 3 of soil in one day. Its cost per day including driver and fuel is Rs. 5000. Then the cost of 10m 3 of excavation can be calculated as:

  • How Much Does Dredging Cost? HowMuchIsIt

    When determining the cubic yards, take the acres to be dredged and multiply 1,600 cubic yards per foot of material depth. So for example, if you have a 10-acre lake and the depth of material to be dredged is five feet, your formula will look like this: 10 x 5 x 1,600 = 80,000 cubic yards.

  • Concrete Costs & Prices ProMatcher Cost Report

    Concrete Delivery $123.50 to $138.27 per cubic yard (3,000 psi 3/4" crushed stone) Price estimate include labor. Estimate includes delivery of concrete material (3,000 psi, 3/4" stone). Cost excludes long-distance deliveries or reinforcing materials. Reported by: ProMatcher Research Team See the Paterson Concrete Cost Report

  • 2020 Average Concrete Removal Cost Thumbtack

    Dec 17, 2018· Accessibility and hand demolition. The location of the removal and the type of concrete play a key role in labor costs, says Henry Fuapau of 4Sons Concrete.When a concrete removal crew is not able to use its hydraulic and machine-operated equipment to quickly break up the concrete, the contractors have to do it by hand using sledgehammers, pry bars, and other handheld tools.

  • What Affects the Cost of Concrete Removal?Concrete removal costs are based on the number of square feet of concrete you want removed, accessibility of the job site, and whether heavy machin...Concrete Removal CostNationally, the average cost for concrete removal projects is $775, as quoted above, but your unique project cost will vary. This is why pros prov...How to Hire a Concrete Removal ProFrom Minneapolis to Miami, you can follow the same guidelines to find a pro concrete removal company. Read online reviews . Peer reviews give insi...Benefits of Concrete RemovalThere are major benefits to hiring concrete removal pros, such as proper handling of materials, injury prevention, and avoiding property damage or...
  • TECHNICAL CALCULATION AND ESTIMATOR'S MAN

    Thank you for showing interest in buying our book TECHNICAL CALCULATION AND ESTIMATOR'S MANHOURS MANUAL You can buy the electronic v ersion of the Manual containing all the figurest and other relat ed data at the following prices: 1. COMPLETE MANUAL (239 pages) US$ 600 US$ 1000 2. EACH CHAPTER IPIPING ABOVE GROUND 36 pages + 20* US$ 180 US$ 300

  • hoe ramming rock excavation price per cubic meter

    A large hoe-ram will often cost contract that rock excavation would be charged at $1500 per day hoe-ram will not, usually, have an hour-meter but rock excavation cost blasting versus hydraulic hammer per cubic Cost per cubic meter solid rock = {1} rock excavation, rock

  • Slump adjustment is a fact of life for concrete

    of a typical 3500-psi concrete mix also are show n . • Cementitious materials 1% (5 pounds of cement per cubic yard) • Water (by volume or weight) 1% (2.5 pounds or 1⁄ 3 gallon of water per cubic yard) • Aggregates 2% (60 pounds of aggregate per cubic y a rd ) Wa t e r -cement ratios can va r y by about 0.01. Howe ve r, with uniform

  • Cost to Remove Concrete Estimates and Prices at Fixr

    Unreinforced concrete is easier to remove, as well as lighter and easier to dispose of. 1.5-inches of concrete weighs roughly 18 pounds per square foot, and costs roughly $400 to remove using jack hammers and a hydraulic lift.

  • High-Quality Earthmoving Services for Commercial and

    We will test the soil and bore through the ground to analyze the soil to determine if there are any rock particles and then come up with an estimate of what the total costs will be to remove the rock. Depending on the rock type and other conditions underneath the surface, rock excavation jobs can cost between $5 to $35 per cubic yard.

  • Breaking up is hard to do Concrete Construction

    rates of more than 1,100 cubic y a r ds of unre i n f o r ced concrete per d a y, with 50 to 250 cubic yards per day being typical for mid-s i z e d Whether mounted on a backhoe-loader or an excavator, hydraulic hammers combine mobility and impact power to demolish concrete quickly and efficiently. Breaking up is hard to do By John A. Koski

  • How many hours does it take to manually excavate 1 cubic

    Excavating a cubic meter of dirt for a footing by hand is a serious job. For ordinary soil, that is, soil that isn’t packed hard or full of roots, rocks, or other debris, the 3 to 4 thousand pounds of soil can be removed by a single worker in a fe...

  • CHAPTER 4 COST OF CONSTRUCTION LABOR AND

    If the local wage rate including burden and fringe benefits is LE30 per hour, the unit labor cost becomes LE16.50 per m2. If the wage rate is LE20 per hour, the unit labor cost becomes LE11 per m2. In addition, productivity performance between projects can also be easily compared if contractors keep cost accounting records in man-hours.

  • How to Estimate a Concrete Order Family Handyman

    To determine the cost to pour concrete slab, use the following tips: Amount. Calculate the volume of concrete you need in cubic yards. The formula for cubic yards is this: Multiply the length (10 ft.) by the width (10 ft.) by the depth (.35 ft., or 4 in.) and divide it by 27 (the number of cubic feet in a cubic yard).

  • Application Description Flowable Fill User Guidelines

    Flowable fill is defined by the American Concrete Institute (ACI) as a self-compacting cementitious material that is in a flowable state at placement and has a compressive strength of 8.3 MPa (1,200 lb/in 2) or less at 28 days. Most current applications for flowable fill involve unconfined compressive strengths of 2.1 MPa (300 lb/in 3) or less.

  • A Guide To Ready Mix Concrete Prices

    The average cement truck carries around 6 cubic metres of concrete. Partial loads may be subject to a fee per empty cubic metre. As an alternative, ready-mix trailers can sometimes be hired. These carry up to 1 and three quarter cubic metres, can be attached to a pick-up truck and work out cheaper.

  • Estimating Bucket Capacity CWS Industries

    Volume is: 52 sq. ft. x 12.33 feet = 641.33 cu. ft. Or expressed as Cubic Yards is 641 / 27 = 23.7 Yards3 Where this method has only applied the angle of repose in two dimensions, the SAE Standard Formula applies it in three. Therefore experience tells us that the actual rated capacity of this bucket will be closer to: 23 or 23.25 Yd3 6

  • Hydraulic Breaker Owner s Manual Rock Breakers Inc.

    For example, if a 4 cubic yard piece of hard rock (20,000 psi or greater) needs to be broken in half, a 7,500 ft·lb or larger breaker is required. If a 2 cubic yard piece of limestone (20,000 psi or less) needs to be broken in half, a 3,000-5,000 ft·lb breaker is required. Trenching

  • hydraulic lift required for the trunnion bearing in ball mill

    hydraulic lift required for the trunnion bearing in ball mill. Ball mill lifting trunnion bearings trunnion bearing on ball mill is sutable for what size ball mill trunnion bearings quarry crusher machine for sale get more Trunnion for cement ball mill f 4 2 m crusher mills Trunnion for cement ball mill f 4 2 m the trunnion bearing lube system provides both lift and lubrication for the

  • A Guide To Ready Mix Concrete Prices

    The average cement truck carries around 6 cubic metres of concrete. Partial loads may be subject to a fee per empty cubic metre. As an alternative, ready-mix trailers can sometimes be hired. These carry up to 1 and three quarter cubic

  • Estimating Bucket Capacity CWS Industries

    Volume is: 52 sq. ft. x 12.33 feet = 641.33 cu. ft. Or expressed as Cubic Yards is 641 / 27 = 23.7 Yards3 Where this method has only applied the angle of repose in two dimensions, the SAE Standard

  • Hydraulic Breaker Owner s Manual Rock Breakers Inc.

    For example, if a 4 cubic yard piece of hard rock (20,000 psi or greater) needs to be broken in half, a 7,500 ft·lb or larger breaker is required. If a 2 cubic yard piece of limestone (20,000 psi or less)

  • hydraulic lift required for the trunnion bearing in ball mill

    hydraulic lift required for the trunnion bearing in ball mill. Ball mill lifting trunnion bearings trunnion bearing on ball mill is sutable for what size ball mill trunnion bearings quarry crusher machine for sale

  • How to Estimate the Cost of HIGHRISE CAST IN PLACE

    multiplied by the height to get the cubic feet for each column. The cubic footage is divided by 27 to get cubic yards (one yard is equal to 3 feet, thus one cubic yard is equal to 27 cubic feet) Concrete

  • Frequently Asked Questions FAQs Power Curbers & Power

    Concrete Mix Design(for a cubic yard of concrete): Very low slump zero or close to it. > 1,950 lbs of sand, SSD 4% moisture > 517 lbs (5 1/2 sacks) of cement

  • How Much Does Rock Excavation Cost? HowMuchIsIt

    How much does rock excavation cost? Depending on the type of rock, the size of the job, placement, contractor rates, the equipment being used, and geographical location, most rock excavation jobs will cost $5 to $35 per cubic yard

  • Hydraulic Hammer & Breaker Sizing Guide Gorilla Hammers

    MEDIUM HYDRAULIC BREAKERS (HAMMERS): 1200 4000-ft.lbs. (1627 5423 Joules) are used in both concrete and rock applications with limitations on the size and amount of material to be broken. LARGE HYDRAULIC BREAKERS (HAMMERS): over 4000 ft. lbs. (5423 Joules), are typically used in rock and large scale concrete

  • How to calculate productivity of construction equipment

    2)ideal output=load per cycle*no. of cycle/hour. =2.4*100 (considering 35 second cycle say) 3) apply correction factors. a)excavator correction=0.8 (if area is not a trench exactly bucket size in which case

  • LS300G by Mayco Concrete Pump

    The Mayco / MultiQuip LS300G Concrete Pump is the true value choice for contractors who need performance without breaking the bank. KEY FEATURES • Concrete piston face pressure of 800 PSI (55 Bar) • Concrete

  • Breaker Technology // BXR Series Hydraulic Breakers

    BTI’s BXR Series Hydraulic RockBreakers break-up concrete, aggregate, limestone, hard rock, and granite. To get the best performance from your hydraulic breaker, you need to account for three things: your carrier size, the material your breaking, and your production goals. Your carrier’s operating weight and hydraulic

  • Cost to Excavate Land 2020 Cost Calculator (Customizable)

    The cost to Excavate Land starts at $74.42 $173 per cubic yard, but can vary significantly with site conditions and options. Get fair costs for your SPECIFIC project requirements. See typical tasks and time to excavate land, along with per

  • Concrete Pumps Buying Guide The Concrete Network

    Look at the pump manufacturer's spec sheets for the machine's output rate (usually given in cubic yards per hour) and maximum horizontal and vertical pumping distances. Some models are capable of delivering concrete at rates topping 125 cubic yards per